Canito Service

Flooring

Professional flooring installations. Hardwood, engineered plank, vinyl tiles, and large format custom masonry tiling.

About our service

Update the foundation of your space's design. We install high-end solid hardwood, engineered wood, luxury vinyl planks (LVP), and custom tile layouts for kitchens and baths.

Key Advantages

Hardwood Precision

Flawless spacing, subfloor preparation, and trim transitions.

Waterproof LVP Solutions

Highly durable modern planks perfect for high-traffic or damp areas.

Large Format Custom Tile

Meticulous grout lines and leveled tile layouts for absolute visual symmetry.

Execution Timeline

1

Demo & Prep

Removing old flooring, leveling and cleaning the subfloor.

2

Installation

Laying planks or tiles using premium adhesives and underlayments.

3

Finishing

Installing matching baseboards, transition strips, and shoe molds.

Showcase Gallery & Projects

Service FAQs

Do you install flooring over existing tile?

Depending on height and subfloor stability, some LVP can be floated over tile, but we generally recommend removing old layers for the best result.

How long does wood floor installation take?

Most typical rooms take 1-2 days, while full home installs can range from 3 to 5 days.

Need professional Flooring?

Contact Canito Construction LLC in Texas today for an on-site visit and free quote.

Request Free Estimate
Get a Quote

Schedule Consultation

Fill in your details below and our team will prepare a localized custom estimate for Flooring.

CallWhatsApp